It was basically an admin group that would take the
drawing bundle and create the prints, as blue prints or microfiche and
deliver to the appropriate areas making the available to all of the other
relevant departments such as purchasing, tech pubs and other engineering
groups. This group like
Drafting was associated with but separate from engineering. Today this is
part of engineering included in the PLM system. But it only handled the
drawings which were standard deliverables from engineering. PLM handles the
native CAD data as standard deliverables. Data inside engineering and documents
to deliver outside engineer should be separate and handled by different
groups. This is why PLM will never succeed.